設(shè)計資料您所在的位置:首頁>>企業(yè)資訊>>設(shè)計資料
模具設(shè)計常用英語漢語對比 |
日期:2020-04-17 20:55:30 訪問量:991次 |
1. XXX!你現(xiàn)在有空嗎,我可以問你一些問題嗎? Could I ask you some questions if you are free?/ Are you free now? May I ask you some questions (a question)? 2. 請問此產(chǎn)品的面是否為外觀面?表面做什么處理?是曬紋/拋光? Can you tell me whether the surface of this part is a visible/esthetic one? What will we do for its surface? Texture or Polishing? 3. 請問產(chǎn)品這個面可否加頂針或頂塊?產(chǎn)品允許加扁頂針嗎? Does this part need an ejector pin or an ejector bar? Can we add an ejector blade? 4. 這個產(chǎn)品的柱位我們打算做司筒。(或鑲針)可以嗎? Can we add ejector sleeves or ejector pins in the boss of this part? 5. 產(chǎn)品的這個位置不能出模,我們打算做行位,在此面上會有分模線,你接受嗎? There's an undercut at this position and it needs a slider. It will also have a parting line on this side, is that OK? 6. 產(chǎn)品里面的這個位置我們打算做斜頂或內(nèi)行位,有問題嗎? We will make the lifter and (inner) slider in this position, will that be a problem? 7. 你提供的2D產(chǎn)品圖與3D產(chǎn)品圖不一致,請問以哪一個圖面為準(zhǔn)? The 2D and 3D drawing you provided is not the same, can you tell me which one is correct? 8. 你提供的3D產(chǎn)品圖有的地方?jīng)]有出模角,有的地方膠位太厚,有的地方膠位太溥,這些產(chǎn)品問題我們可以自己修改嗎?修改后會給交給你確認(rèn)。 There is no draft angle in the 3D drawing, some materials are too thick, and some place are too thin. Can we modify this part by ourselves? We will send the drawing to you for you to check after we modify it. 9. 按你們提供的縮水率千分之五,這個模具的尺寸已經(jīng)做到了模具圖面要求。但注塑出來的產(chǎn)品不符合你們的產(chǎn)品圖。 請確認(rèn)你們的材料的縮水率是否正確? Accoring to the shrinkage one over two hundred, the mold has been done in the right dimension, but the part falls short to your part drawing, are you sure the shrinkage is right? 10. 產(chǎn)品的這個位置太小,導(dǎo)致模具鋼料太溥,能夠加寬這個位置嗎? This position is too small and will make the steel material here too thin, can we widen it here? 11. 斜頂與后面的柱位空間太小,斜頂在運(yùn)動時會干涉到柱子,能移動這個柱子的位置嗎? The angular lifter interferes with the boss during ejection. Please consider changing the position of the boss. 12. 這個筋骨位膠厚太溥,而且高度偏高,注塑時很難填充這個筋位,可以增加這個筋骨位的厚度嗎? The rib here is too thin and on the high side, so it will be difficult to fill here when we do the injection, can you inrcease the thickness of this rib? 13. 你是想將此筋骨位的高度加高/減低嗎?加膠的位置我們將用銅公放電加深。但減膠的位置有兩種做 法,1、做鑲件;2、燒焊;因為鑲件的底部有運(yùn)水,我們簡單的做法是燒焊處理,你可以接受嗎? Will you increase/decrease the material on this rib? We will use EDM if you add material, but there are two option if you choose to decrease:1.Make inserts;2.Welding, because there is water in the bottom of the insert, is that OK? 14. 這個樣板的筋骨位底部燒焦,是因為排氣不良,我們可以在筋骨位的中間增加一個鑲件。 This sample has been burned in the bottom because the venting is not good, we can add an insert in the middle of the rib. 15. 重做鑲件大約需要5-6天時間,你能接受嗎? It will take about 5 or 6 days to redo the insert, is that OK? 16. 產(chǎn)品的這個面我們已經(jīng)做了曬紋處理,如果需要加膠,這個面我們需要重新外發(fā)曬紋??赡苄枰獛滋斓臅r間。 所以我們直接以銅公放電的火花紋取代你要求的紋路,你可以接受嗎? We have made the texture on this side, if we add material, it will take some days to remake the texture by out-resourcing, so we suggest using the texture by EDM instead, is that OK? 17. 模具是用公制/英制的配件?需要備用件嗎? Is this mold dimension measured in inches or meters? Does it need spare parts? 18. 模具上銘牌上的刻字內(nèi)容是由你們提供嗎?你們什么時候可以這些刻字資料。 Will you provide the engraving content of the plate of this mold to us? When will you send it? 19. 可否提供此模具生產(chǎn)時,注塑機(jī)的型號及相關(guān)資料。如:啤機(jī)大小、呵林柱尺寸、頂棍孔尺寸等 Can you provide the type of injection machine and other related information of this mold to us? Such as the boss dimension, the hole's dimension of the ejector pin and the size of the injection machine and so on. 20. 這個問題我需要同其它同事商議會再答復(fù)你。 I need to discuss this problem with the other colleagues and then I will reply back to you. 21. 我們將盡力達(dá)成你的計劃,如有異常,會及時通知你。 We will try our best to complete your plan, if there are any complications, we will notify you immediately. 22.這個產(chǎn)品的長度為330.12MM,寬度為78.96MM,高度為45MM.膠厚為2MM,重量為70.63g,試模注塑機(jī)型號為250噸,膠料顏色為黑色,產(chǎn)品外表 面曬紋處理,內(nèi)表面為拋光.需要日期章、環(huán)保章、材料章.前后模用2344氮硬,斜頂和行位座用738H,以上模具信息正確嗎?請確認(rèn)! "The length of this part is 330.12MM, Width is 78.96MM, height is 45MM, thickness is 2MM, weight is 70.63g, the injection machine is 250T,the material is black, the outside of the part has texture, inner side needs polishing, and it also needs a date and recycle stamp,
the core&cavity is 2344 nitridng, the lifter and slider shelf is 728H. Please check the information above!" 23. 現(xiàn)在到了吃午鈑的時間,我們下午再繼續(xù)好嗎? It is time to have lunch, let's discuss this project later this afternoon? 24.和滑塊干涉的倒勾請加料填平至滑塊可以順利滑動 (The undercut area interferes with the slide block and needs to be filled with material to help the slider move smoothly.) 25. 加肉太多 (The thickness added is too thick.) 26. 加肉面積太大 (The thickening area is too wide.) 27.GATE位置移位 ( The gate position is moved.) 28. 滑塊拆的位置 (The split line of slide block or the area of slide.) 29. 此處有尖角,填充困難 (It is hard to fill this area due to the sharp feature.) 30. 此處鋼材太薄,強(qiáng)度不足而且不容易冷卻 (The strength of this area is too weak and it is hard to cool because the steel is too thin.) 31. 圓柱特徵要有一半圓不可以拆在滑塊上,以免粘滑塊造成拉白,拉斷 (We avoid designing the semicircle of the cylinder on the slide block because it will be pulled apart or cause drag marks.) 32. 此處做斜銷在作動時會削到成品肉厚 (The part will be damaged if we make the lifter in this area.) 33. 這個面是裝配面,不能加料 (This is a critical surface where we cannot add additional material.) 34. 此處料位太厚,會有縮水,建議減料改善 (Because of the shrinkage of the thickness, we suggest reducing some wall thickness to improve it.) 35. 此面是不是外觀面,此處做滑塊的話會有夾線,是否可以接受 "(Please confirm whether it is a critical surface or not. Also, confirm whether it is acceptable to have a slide split line if we have a slide in this area. )" 36. 此處有倒勾,能否減料,使公母??科?,不做滑塊和斜銷 "(Please confirm whether we can reduce material to the area where we have an undercut as indicated to have shut off on cavity side. No slide block and lifter will be made. )" 37. 請盡快確認(rèn)這種拆模方式和結(jié)構(gòu),否則會影響模期 (Please confirm the issues of Parting line, Gate position...Etc. as soon as possible; otherwise, the lead-time will be extended.) 38. 此面是否有特殊要求,能否有頂針印 (Please confirm whether it is a critical surface or not and if we can have E.J. pin marks on it.) 39. P.L面開在此處,模具上會有尖角和刀口,對模具壽命有影響 (There are sharp edges if we set the parting line here, It will reduce the tool life) 40. 加大拔模角,以便脫模順利 We suggest enlarging the draft angle to help release the tool.) 41. GATE做在此處的話有兩個缺點(diǎn):1.蓋子打開時可以看到GATE的修剪部位; 2.兩個斜銷在同一側(cè),頂出也不是很平衡. (There are two problems if the gate is to be designed in this area: a). It is easy to see the gate mark when you open the cap. b). The ejectors are unbalanced when two lifters are on the same side) 42. GATE做在此處的話.蓋子打開後看不到GATE的修剪部位 (The gate mark is not visible if the gate position is designed like this.) 43. 如果GATE一定要做在你們指定的位置的話,那還不如做在這一側(cè),這樣的話還可以減小這個位置的縮水 "(If you insist that the gate position has to be like the original design, then we would further recommend to have it to the area indicated so it can avoid a shrink problem in this area.)" 44. 在此處GATE做潛頂針的話,背後的外觀面會有沖料痕,而且成品又是黑色的,會最明顯 (If the design of the gate has to be a sub. Gate, then the back surface of the part will have serious flow marks due to the black colour.) 22. P.L開在此處不合理,模具加工困難,P.L應(yīng)改為和圖示的一樣 "(This area is not suitable to have a Parting line because the tool will become more complicated; therefore, we recommend to have the Parting line as indicated.)" 45。產(chǎn)品粘母模的機(jī)會很大,能否在公模加倒勾,拉料頂針或者公模保留E.D.M紋,開模時使成品留在公模一側(cè) "(There is possible sticking on cavity; therefore, please confirm whether it can make undercuts, snatch pins or leave coarse E.D.M. on the core to snatch the part on) " 46.此處料厚段差很大,成品表面會有應(yīng)力痕,是否接受 (Please confirm whether it is acceptable to have stress lines on the surface because the thickness is not equal.) 47. 請注明何處為外觀面,能否提供2D圖和注意事項 (Please advise where the critical surface is. Please also provide us a 2D drawing with critical dimensions. ) 48. 紅色所示處是有問題的地方,請?zhí)貏e注意 (Please note the red highlights because those areas have problems.) 49. 成品設(shè)計此處有問題,建議如下圖所示修改 (We would suggest using the attached part design as the current design has problems.) 50. 此處改為一個球形的凹槽 (We suggest modifying it as a globe recess.) 51. 圓柱特征要有一半不可以拆在滑塊裡,以防拉斷 (this issue is the same as no.8) 52. 此處大滑塊上走小滑塊,小滑塊要先退,大滑塊要做延遲 (The inside small slide block will recede first and the parent slide block have to postpone sliding.) 53. 滑塊要用液壓油缸抽芯以保証開合模順序 (The slide pins will use an oil cylinder to assure that the process is in proper order.) 54. 這個面有裝配,加料的話裝配時會頂住,如圖所示 "(We cannot add material to this surface because it will intervene between the two parts when it is assembled. Please see the sketch attached. )" 55. 可降低斜銷面,增加成品些許肉厚來做變化 (To descend the surface of lifter in order to thicken the part.) 56. 一半做斜銷,一半做自然 (One half side will have the lifter and the other half will be solid/nature.) 57. 此處兩個柱子重疊,有倒勾,不能做自然,要做SLIDE "(These two bosses are overlapping with undercut therefore it can not be made as solid. We suggest making it with a slide block.)" 58. 此處強(qiáng)迫頂出 (This area needs force ejection.) 59. 公模兩段開模,這個地方先退 (Here will be a double ejection for forward and receding.) 60. 此處做鑲件會有夾線,能否接受
(Please confirm whether it is acceptable that there will be a split line here.) 61. 此面公母模1度靠破,會有段差,可否接受 (Please confirm whether it is ok to have mismatch to the area where there is 1 degree of shut off in Core / Cavity side.) 62. 這個尺寸能否加大 (Please confirm whether we can enlarge this dimension.) 63. 此處加一個凹槽,膠片的彈出效果會更好一些,試模後看裝配的效果再做修正 "(It will affect the elastic of the film better if we add a recess. See how it will affect the assembly parts, and then make your decision.)" 64. 此處有倒勾,建議將剖面線所示部位CUT即可避免此處的倒勾 (There is an undercut here, we suggest cutting out the indicated part as it highlighted to avoid an undercut.) 65. 成型後SUB GATE要修平 (The gate (sub gate) needs to be trimmed evenly after being moulded.) 66. 此處倒勾先垂直頂出,之後再手動取出 (This area of the undercut needs to be ejected vertically, then taken out manually.) 67. 這兩個面都有滑塊,GATE改在此處改不到 (The gate is not suitable in this area becuase there are two sliding blocks sealing off this area.) 68. 此處加做一個旋轉(zhuǎn)GATE,射出時方便調(diào)整成品的品質(zhì) (We would suggest placing a runner shut-off insert to adjust the volume of part filling.) 69. 此倒勾在滑塊上強(qiáng)迫脫模,倒勾是否可以減小到0.6 (This undercut will be force ejected out, Please confirm whether it can be reduced to 0.6 mm.) 70. 此柱子無法脫模,請確認(rèn)是否是在轉(zhuǎn)圖時錯位,能否提供客戶的原始圖檔 data. ) (This boss is not releasable. Please check the file again and if possible, pleas re-send us the original draft.
71. 此柱子是實(shí)心的,會縮水 (This boss will shrink because it is a solid boss.) 72. 這個面是否要咬花,咬花番號是什麼,最小的拔模角要多大 (Please confirm whether this surface needs to be textured or not. Please advise texture specs. Also, what's the min. draft. ) 73. 這個面是否要打光,貼標(biāo)簽 (Please confirm whether this surface needs to be polished and stuck on a sticker.) 74. 紅色顯示的幾個面拔模角太小,出模時會拉傷,建議加大拔模角 "(The red highlighted area has a problem of a small draft angle. We suggest enlarging the draft to avoid casuing drag marks on the part.)" 75. 此RIB太薄,會填充不足 (This rib can not be filled properly because it is too thin.) 76. 此RIB太厚,會縮水 (This rib will have a shrink problem because it is too thick.) 77. 此處倒勾出模困難,建議先不做倒勾,成型後再二次加工,但要做治具,費(fèi)用要另外算 (There are problems with this current design, we recommend doing this undercut as an alternative but there will be additional costs.) 78. 柱子底部都要做火山口 (The base of all bosses require a crater to avoid shrinkage.) 1.鑲件,P.L.面有充足排氣坑,P.L.面要開環(huán)形排氣槽,并能將氣體排到模外。 Insert/PL should have adequate venting,PL should have around slot for venting. 79.頂棍孔鑲件端面距離底板面0,5mm,攻m20牙; the surface of KO insert shound below bottom plate 0.5mm,thread M20. 80.回針,中托司與模胚部份避空0.5mm; RP,EGP should have 0.5mm gap with the moldbase. 81.排氣槽距封膠位10-15mm; Venting slot distance from the seal off position 10-15mm 82.運(yùn)水進(jìn)用 E ,運(yùn)水出用 S ; Intake"E",Outtake"S" 83.底面板均要有隔熱板,DME規(guī)格1/4厚; Top/Bottom plate must have insulator plate,DME standard 1/4'H 84.吊環(huán)要在模具的重心(保證吊模時的平衡); Eyebolt should on the center of the mold(for balance) 85.吊模螺絲的位置要在前/后模部份的重心,保持平衡; The eyebolt position on the cavity/core side should on the center of gravity for balance 86.唧嘴分試模唧嘴/走模唧嘴; Sprue type:Trial/Delivery 87.喉塞選用:NPT規(guī)格; Plug use NPT spec. 88.中托司采用HASCO滾珠形式. Use HASCO ball EGP 89.水咀采用法國標(biāo)準(zhǔn):1/4"的水咀寫:RPL08-1151 Jiffy Use French Standard: 1/4" mark:RPL08-1151
All in English& Imperial Unit全部使用英文和英制單位 Are part dimensions to print plus shrink?請檢查內(nèi)模尺寸有否乘縮水? All wires protected from sharp corners?凡有電線通過的角位要改為R角,是否完成? All replaceable components must be standard components.所有替換的元件必須是標(biāo)準(zhǔn)件。 Add shot counter?是否加啤塑總計器? A complicated mould with thorough design consideration to overcome the numerous design contraints. 一個復(fù)雜的模具,設(shè)計經(jīng)過周詳考慮,成功地克服了各種設(shè)計上的限制。 All moving components should use hardened steel : all slides should be installed with hardend or lubricated alloy wear plates and gibs, and with positive slide retainer. 所有移動的零件應(yīng)使用硬鋼料,行位必須用硬墊板和硬線條,而且必須有限位及定位鎖。
BOM including water fittings,ejectors&custom components.BOM的內(nèi)容應(yīng)包含運(yùn)水接頭,頂針和自制的零件. BeCu for lifters if w/o water circuits。若沒有運(yùn)水回路,斜頂為鈹銅。
Corresponding components mirrored at core&cavity對應(yīng)的部件在前、后模平面視圖中鏡像 Check polish for line of draw finish?有否省光就出模? Core pull slot mechanism installed and O.K. 蘇州模具設(shè)計 Crane capacity and loading clearance.模具須用多大吊機(jī)才可搬動。 Conduct moldflow &mold warp analysis.經(jīng)流道及變形電腦模擬分析。 Component and/or 3D mould design drawing.散件圖或3D模具圖 Cooling less important when dimensions are not important.若尺寸不重要,適量冷卻也可。 Combine a traditional 4 cavity edge gate and a 4 cavities reverse gate mould which help to double the moulding capacity and reduce production cost. 將一個標(biāo)準(zhǔn)四模腔大水口模具與一個四模腔倒轉(zhuǎn)大水口模具結(jié)合成為一套可于同一大小的注塑機(jī),生產(chǎn)量可增加一倍的層板模具,并且可降低成本。 Can be seperated into two individual moulds for moulding in two different mould shops. 此模具最大的特式是,可將模具分開變成兩套,在不同地方生產(chǎn),增加生產(chǎn)的靈活性。 Consists of all standard mould components which facilitates mould maintenance. 由于全套模具均利用模具標(biāo)準(zhǔn)零件制成,在維修及換零件上比較方便。
Die draw called out出模方向的標(biāo)示 Dimension all the opening , travel & clearance標(biāo)出前、后模距離,滑動部件滑動距離和塑件脫離的位置 DME egr. Water fittings recessed and marked?是否使用DME運(yùn)水接頭及編號? Delivery right side up , or in two halves?開箱后是否容易吊出模具及是否分開前/后模運(yùn)輸? Eyebolt size and balance in 2 sides吊??壮叽?,平衡,4邊都要有 Ejection stroke & slide, lifter travel dimensioned出行程、行位、斜頂行程的標(biāo)注。 Ejection study if lifter adopted若有斜頂,做出分析。 Ejection extended at the most頂出到極限位置 Ejector guide pins installation .頂針導(dǎo)柱的安裝。 Eyebolts for inserts more than 50lbs.重量大于50lbs的鑲件必須要有吊??住?/span> Edge gate or sprue gate requiring secondary operation acceptable.邊緣型或直入型水口都可以接受。
4 point in HRC different to lifters contacting or cavity steel。斜頂和與其接觸的內(nèi)模或鑲件在硬度上有4度的差別(HRC)。 4X size section , dimensioned to reflect the actual size.水口及水口頂針的4倍放大視圖,按實(shí)際尺寸標(biāo)注。
General ,safety and handling 常規(guī)、安全和搬運(yùn)要求 Guided ejection recommended for mould above 100 tons clamp capacity, ejector pins of 1.5mm or smaller, or ejector stroke longer than 50mm. 建設(shè)模具用于鎖模力超過100噸的注塑機(jī),或有1.5mm以下的頂針或頂出行程超過50mm時,應(yīng)裝上頂針板導(dǎo)柱。 Guide pin cleared and vented?邊釘插入模板有否頂著及加疏氣空? Hot manifold wired to print and checked? 熱咀電線接位有否編號? Horn pin clearance hole?斜邊與行位有否空間? Hydraulic actuated slide together with electrical limit switch.行位采用油壓推動,配合安全電制。 Heaters fitted+0.002/-.000, leads tagged and connected to terminal.熱嘴裝配,電線源頭、尾有否安裝穩(wěn)固。(+0.002/.000)
Inserts keyed and numbered to prevent incorrect assembly.鑲件定位和編號以防止不正確的組裝。
Jaw angle 3 deg.more than angle pins(<25 degree).斜面角度要比行位斜邊角度大3度(<25度)。
Keep enough space to run waterline at slide /lifter/major inserts.在行位、斜頂、主要鑲件處保留足夠位置(空間)布置水槽。 Lifter angle less than 15 degree.斜頂角度小于15度。 Lifter rods dia, less than 1".斜頂桿直徑不能少于1"。 Limit switch in tact and protected.是否已安裝限位制? Moldbase and steel dimensioned模坯和鋼料號的標(biāo)注 Minimum 5 deg.for shut-off.斜頂鑲件最小5度插穿。 Mechanism for sequence動作機(jī)構(gòu)是否正確? Mold safety straps installed and painted red?是否已安裝安全帶及噴上正確顏色在模坯上? Mould flow and simulation should be carried out for the best gate location, filling analysis, pressure distribution and heat distribution. 適宜應(yīng)用模擬的模具注塑過程,注射分析、壓力分布及溫度分布以確定最佳入水位置、流道尺寸和疏氣位置等。 Mould should be designed with maximum cooling and with appropriate amount of ejection points. 模具在設(shè)計上要做到盡快冷卻,上、下內(nèi)模高溫點(diǎn)應(yīng)該有個別的冷卻,應(yīng)有適量頂針。 Mould should be able to run fully automatic. Large part should be picked up by robot. 模具能夠全自動生產(chǎn),大的零件應(yīng)由機(jī)械手拿出。 Mould should be tested to meet a defined Cpk quality standard.模具經(jīng)過測試,符合預(yù)定的Cpk質(zhì)量標(biāo)準(zhǔn)。 Mould should have safety features to protect accidental damage, incorrect assembly and set up of mould. 模具應(yīng)具備可以預(yù)防意外損害及錯誤安裝等安全特性。 Mould halves requiring accurate alignment of core and cavity, and shut off should have appropriate part line locks. 上、下模需要精確配合或有擦位的地方, 模具一定要有直身鎖。 Mould requiring heating should have insulator plate.需要加熱的模具,必須有隔熱板。 Mould preferred to run automatic; self-degating whenever possible.模具最好能自動生產(chǎn),模具盡可能自斷水口。 No obstructions on buttom surface of mold? 模具必須穩(wěn)定位置如有凸出物請加腳座,是否完成?
Overall mold size of the moldbase & shut height模坯長寬和模厚(模架的長寬) Outlets accessible and marked " IN OUT and NUMBER"?出入水位有否打上IN 、OUT 字碼? Protruding items shown and protected。畫出突出部件并做好保護(hù)。 Parting line at the acceptable surface.合模分布在合理可接受的表面。 Put waterline as much as possible/wherever possible。盡可能布置多的運(yùn)水。 Put waterline for slide /lifter/insert wherever possible.盡可能在行位、斜、鑲件布置運(yùn)水。 Parting line cleared and released properly?分模線是否正確? Proper locating ring and diameter?定位圈尺寸及直徑是否正確? Proper radius and orifice on sprue bushing and keyed.唧嘴R及管釘是否正確? Part line lock recommended when there is shut off.當(dāng)有擦位時,最好有直身鎖保護(hù)。 Protruding items shown and protected.如有零件凸出,模坯請加保護(hù)物。 Proper K.O. holes size and location.頂棍孔尺寸及位置是否正確? Runners to be balanced. 流道必平衡。 Runners cross section type and size as per standard.流道切面形狀和尺寸符合標(biāo)準(zhǔn)。 86.Runner and parts should be ejected automatically .Multiple ejection should be avoided. 頂出方法可使流道與產(chǎn)品自動掉下,避免運(yùn)用多次頂出方法。 Sufficient view and section足夠的視圖和切面圖 Safety Strap in red模塊藏入模坯,要涂成紅色。 Standing steel supported to keep stable.加撐腳以保前、后模能平穩(wěn)放置。 Support pillars>50% part projection area , steel :1040。撐頭面積大于50%的產(chǎn)品投影面積,材料:1040. Safety strap clear tie bar?鎖模塊與哥林柱沖突嗎? Sucker with reverse 10 deg. Undercut。10度倒扣的流道拉料桿。 Steel type & hardness of slide &heel blocks行位和壓條的料號和硬度。 Sufficient stroke of lifters(1/16"+ undercut size)?斜頂是否有足夠的行程(1/16”+倒扣尺寸)? Sufficient stroke for floating plate?浮動板是否有足夠的行程? Sufficient stroke as well as part and runner falls clear.是否有足夠的行程使品和流道脫落? Spring around return pins and press ratio<33?是否有回針的彈簧及其壓縮比(<33%)? Special instruction stamped on top and operator side?客戶如有特別指示請打在模坯頂及操作面上,有否完成? Screws tight and all installed?螺絲是否全部收緊? Support posts ground and screwed to clamp plate and pre-loaded.撐頭是否高出方鐵? Spring pockets correct depth , spring deflection max.40%?全部彈弓壓縮比是否為1/3 S? Standing steel well supported?成品與內(nèi)模之間的鋼材是否足夠? Single drop of cold sprue gating is designed after moldflow analysis, which ensures a balance flow of plastic and easy for moulding. 用moldflow分析決定產(chǎn)品的入水位置,使膠料分流平均,易于注塑。 Self-degating whenever possible .Hot runner system should be considered. Standard components should be used.盡量使用標(biāo)準(zhǔn)件。 Semi-automatic and use of mould release acceptable.半自動工手放鑲件也可。 To swing mold corner to corner size if necessary若有必要,讓模具以對角方式移動 To prevent lifter from rotation.要求防止斜頂旋轉(zhuǎn)。 Tooling aids and drawings to be shipped?圖紙及配件是否跟模坯一同送走? The aid of 5 drops gas assist injection design.5點(diǎn)氣輔注塑 昆山模具設(shè)計 To eliminate sink mark caused by inherent thickness of the wall.消除厚膠位導(dǎo)致的外觀凹陷現(xiàn)象 To swing mold , corner to corner size.按吊模孔中心計算轉(zhuǎn)動模坯最大直徑。 Update title block/revision.更新標(biāo)題欄/版本 Use standard components when appropriate.適當(dāng)?shù)臅r候使用標(biāo)準(zhǔn)件。 View of deepest point最深點(diǎn)(位置)的剖切視圖
前一頁:注塑模具2D組立(結(jié)構(gòu))圖設(shè)計步驟及注意事項,蘇州模具設(shè)計公司整理發(fā)布 后一頁:內(nèi)螺紋模具設(shè)計教程 |